Projects¶
Plans, boards and people for your hub's projects. A project is the hub's own record (its customer, status, dates and agreed value); Projects adds the rest.
What it does¶
- A plan: phases (a span of work with a start, a due date and progress) and milestones (one date), in order, each with a status (planned, in progress, blocked, done, cancelled) and someone responsible, shown on a timeline. A project's progress comes from its plan.
- Boards: every project in your workspace's own status columns, with progress, next step, overdue and blocked steps and team; and each project's steps as a board. Drag a card, or use its Move to list.
- Estimates on a project: the estimates filed under it, with what's accepted and still open, against the agreed value. Amounts stay in their own currency.
- People: who works on a project or one of its phases, for so many hours a week. The workload page shows each person's hours week by week against their capacity (40 hours unless set), and says when a week is over.
Dates are your workspace's, in its time zone; weeks start on Monday.
Permissions¶
| Who | Can |
|---|---|
| Staff (by default) | See plans, boards and workloads; plan projects and move them on the board (moving a project also needs permission to change records) |
| Administrators (until they give it out) | Assign people to projects and set their weekly capacity |
With AI¶
Connected AI apps can list and look at projects, add or change phases and milestones, assign people and check workloads. They never delete: a step is cancelled, an assignment ended.
Getting it¶
Projects is a paid module. It needs Catalog and Estimates, which come with the hub. Whoever installed your hub adds it: see Add or remove modules.